Last night we managed to bolt the head down and set up the timing.
The head had a new Piper 285T2 Cam, Piper lifters, vernior pully and Piper Cam belt fitted before it was bolted down on the block.
The head has also had a lot of work on it being ported and polished etc.
The block had been fitted with steel con rods, forged pistons and flywheel lightened etc etc.